|
|
|
|
| LEADER |
09027nam a22004453i 4500 |
| 001 |
EBC6986485 |
| 003 |
MiAaPQ |
| 005 |
20231204023224.0 |
| 006 |
m o d | |
| 007 |
cr cnu|||||||| |
| 008 |
231204s2022 xx o ||||0 eng d |
| 020 |
|
|
|a 9783030964740
|q (electronic bk.)
|
| 020 |
|
|
|z 9783030964733
|
| 035 |
|
|
|a (MiAaPQ)EBC6986485
|
| 035 |
|
|
|a (Au-PeEL)EBL6986485
|
| 035 |
|
|
|a (OCoLC)1319215966
|
| 040 |
|
|
|a MiAaPQ
|b eng
|e rda
|e pn
|c MiAaPQ
|d MiAaPQ
|
| 050 |
|
4 |
|a HF3871-3937
|
| 082 |
0 |
|
|a 658.40409669
|
| 100 |
1 |
|
|a Ibrahim, Jimoh.
|
| 245 |
1 |
0 |
|a How Megaprojects Are Damaging Nigeria and How to Fix It :
|b A Practical Guide to Mastering Very Large Government Projects.
|
| 250 |
|
|
|a 1st ed.
|
| 264 |
|
1 |
|a Cham :
|b Springer International Publishing AG,
|c 2022.
|
| 264 |
|
4 |
|c ©2022.
|
| 300 |
|
|
|a 1 online resource (253 pages)
|
| 336 |
|
|
|a text
|b txt
|2 rdacontent
|
| 337 |
|
|
|a computer
|b c
|2 rdamedia
|
| 338 |
|
|
|a online resource
|b cr
|2 rdacarrier
|
| 505 |
0 |
|
|a Intro -- Preface -- Contents -- About the Authors -- List of Figures -- List of Tables -- 1: Introduction: The Project Abandonment Problem -- References -- 2: What We Know About the Management of Very Large Projects -- 2.1 Project Success Factors as Lists -- 2.2 The Project Success Frameworks of Miller and Lessard and Morris and Hough -- 2.2.1 Miller and Lessard (2000) -- 2.2.2 Morris and Hough (1987) -- 2.3 The Nigerian Context -- 2.4 The Extended Theoretical Framework -- 2.5 What About Corruption? -- References -- 3: Structure of the Investigation -- 3.1 Overview of the Approach Taken in This Study -- 3.2 Construction and Execution of the Survey -- 3.3 Construction of the Sample of Projects -- 3.4 Construction of the Case Studies -- Appendix: Full Questionnaire as It Was Administered -- Our Request -- Project Variables -- Section A: Background Information -- Section B: We are asking 40 questions that relate to the methods and structures with which the project was managed. (Circle the number that corresponds to your reaction/estimation or fill out the text.) -- A. Governance -- B. Project Initiation -- C. Project Execution -- References -- 4: A Description of the 38 Matched Projects -- 4.1 Lagos-Ibadan Express Road -- 4.2 Lagos-Badagry Express Road -- 4.3 Third Mainland Bridge -- 4.4 Second Niger Bridge -- 4.5 Egbin Power Station -- 4.6 Calabar Power Station -- 4.7 Zungeru Hydropower Plant -- 4.8 Delta State (Oghareki) Power Plant -- 4.9 Shiroro Hydroelectric Power Station -- 4.10 Omoku Power Plant Station -- 4.11 Mambilla Hydroelectric Power -- 4.12 Ajaokuta Steel Project -- 4.13 Kanji Dam -- 4.14 Otukpo Dam -- 4.15 Nigeria Satellite 2 -- 4.16 Nigeria Satellite 1 -- 4.17 Airtel Nigeria -- 4.18 Nigerian Telecommunications Limited (NITEL) -- 4.19 Godswill Akpabio International Stadium.
|
| 505 |
8 |
|
|a 4.20 (Samuel) Ogbemudia Stadium -- 4.21 Abuja International Airport -- 4.22 Lagos MMA2 Airport -- 4.23 Yenagoa International Cargo Airport -- 4.24 Jigawa Airport Project -- 4.25 Tin Can Island Port -- 4.26 Calabar Seaport -- 4.27 Victoria Garden City (VGC) Housing Estate -- 4.28 Festac Town Federal Housing Estate -- 4.29 1004 Housing Estate -- 4.30 Abuja Mass Federal Housing Project -- 4.31 Olusegun Obasanjo Presidential Library -- 4.32 Abuja National Library -- 4.33 Nigerian Youth Empowerment Scheme (N-Power) -- 4.34 Nigeria Subsidy Reinvestment and Empowerment Programme (SURE-P) -- 4.35 Lagos State Waste Management Authority (LAWMA) -- 4.36 Cleaner Lagos Initiative (Visionscape) -- 4.37 University College Teaching Hospital (UCH) Ibadan -- 4.38 University of Abuja Teaching Hospital (UATH) -- References -- 5: Insights from the Analysis of the Questionnaires -- 5.1 Variable Distributions and Variable Capability to Detect Differences Across Projects -- 5.1.1 Each Respondent Type Adds Unique Perspectives and Information -- 5.1.2 The Variables Capture Robust Differences Between Abandoned and Completed Projects -- 5.2 Condensing Variables into Aggregated Success Factors -- 5.2.1 Approach -- 5.2.2 Identifying the Factors -- 5.3 Econometric Prediction of Project Completion -- 5.4 Econometric Prediction of Cost and Schedule Overruns for Completed Projects -- 5.4.1 Effect of Variables on Budget Overruns -- 5.4.2 Effect of Variables on Schedule Overruns -- 5.5 The Corrosive Effect of Corruption -- Appendix 1 Correlations Among Independent Variables Across All 114 Responses -- Appendix 2 Factor Analysis -- Appendix 3 Specification of the Logistical Regression -- Appendix 4 The Logistical Completion Probability Regression by Respondent Group -- Appendix 5 Robustness Analysis: Cost Overrun Regressions by Respondent Group.
|
| 505 |
8 |
|
|a Appendix 6 Robustness Analysis: Schedule Overrun Regressions by Respondent Group -- 6: Two Library Projects -- 6.1 The National Library of Nigeria in Abuja: An Abandoned Project -- 6.1.1 Project Initiation -- 6.1.2 Contract Signature and Execution -- 6.1.3 Conclusion -- 6.2 Olusegun Obasanjo Presidential Library: A Completed Project -- 6.2.1 Project Initiation -- 6.2.2 Project Execution and Outcome -- 6.2.3 The Difference Between the Two Projects: In the Words of Former President Obasanjo -- References -- 7: Two Bridge Projects -- 7.1 The Second Niger Bridge: A Stalled Project -- 7.1.1 Project Initiation -- 7.1.2 Contract Disputes and Recontracting -- 7.1.3 Continued Stalling -- 7.1.4 Diagnosis of the Reasons for Failure, in the Words of (Former) President Jonathan -- 7.1.5 Conclusion -- 7.2 The Third Mainland Bridge: A Completed Project -- 7.2.1 Introduction -- 7.2.2 Starting and Stalling -- 7.2.3 Restarting the Project Under President Babangida -- 7.2.4 Project Execution and Outcome -- 7.2.5 Conclusion -- References -- 8: Two Power Plants -- 8.1 Egbin Power Station, Ikorodu Lagos State: A Completed Project -- 8.1.1 Initiation and Completion -- 8.1.2 Success Conditions and Challenges -- 8.1.3 Privatization and Trouble -- 8.2 The Calabar Odukpani Power Station: Completed but with Little Delivery -- 8.2.1 Project Initiation -- 8.2.2 Project Complications and Delays -- 8.2.3 Delivery of the Calabar Power Station in 2015 -- 8.2.4 What Has Been Delivered? Lessons from the Project -- References -- 9: Two Express Road Rehabilitation Projects -- 9.1 The Lagos-Ibadan Express Road Rehabilitation: A Completed Project -- 9.1.1 Original Construction of the Express Road -- 9.1.2 A Reconstruction Project in a PPP Scheme -- 9.1.3 Restructuring the Project as a Government-Owned Project -- 9.1.4 Discussion.
|
| 505 |
8 |
|
|a 9.2 Lagos-Badagry Express Road Rehabilitation: A Stalled Project -- 9.2.1 Brief History -- 9.2.2 Was the Problem the Fault of the Contractor? -- 9.2.3 Dodgy Funding and Accounting -- 9.2.4 Protest, Additional Funding and Patching Up -- 9.2.5 Conclusion -- References -- 10: Two More Power Plants -- 10.1 The Zungeru Dam/Hydropower Plant: A (Soon-to-Be) Completed Project -- 10.1.1 Brief History -- 10.1.2 Enabling Factors of Completion -- 10.2 The Delta State Oghareki Power Plant: An Abandoned Project -- 10.2.1 Initiation -- 10.2.2 The Alleged Corruption -- 10.2.3 Implications -- References -- 11: The Ajaokuta Steel Project -- 11.1 Project Initiation -- 11.2 Project Construction and Cessation by 1988 -- 11.3 The PPP Revival of 2000-2007 -- 11.4 The State of the Asset -- 11.5 Conclusion -- References -- 12: Insights and Recommendations -- 12.1 Summary and Discussion of the Findings -- 12.2 Developing Solutions: Inspiration from Other Countries -- 12.3 Recommendations -- 12.3.1 Recommendations Part 1: Short-Term Changes -- 12.3.1.1 Diagnostic Review of Abandoned or Stalled Projects -- 12.3.1.2 Resolving Funding Challenges -- 12.3.1.3 World Bank/IMF Assistance -- 12.3.2 Recommendations Part 2: Longer-Term Structural Changes -- 12.3.2.1 Element 1: High-Level Political Priorities -- 12.3.2.2 Element 2: Portfolio Planning and Budgeting -- 12.3.2.3 Element 3: Institutional Changes -- 12.3.2.4 Element 4: Project Execution in the New Ministry -- 12.3.2.5 Element 5: Audit Bureau -- 12.3.2.6 Element 6: Fraud Prosecution -- 13: Conclusion: The Government Responsibility -- Index.
|
| 588 |
|
|
|a Description based on publisher supplied metadata and other sources.
|
| 590 |
|
|
|a Electronic reproduction. Ann Arbor, Michigan : ProQuest Ebook Central, 2023. Available via World Wide Web. Access may be limited to ProQuest Ebook Central affiliated libraries.
|
| 655 |
|
4 |
|a Electronic books.
|
| 700 |
1 |
|
|a Loch, Christoph.
|
| 700 |
1 |
|
|a Sengupta, Kishore.
|
| 776 |
0 |
8 |
|i Print version:
|a Ibrahim, Jimoh
|t How Megaprojects Are Damaging Nigeria and How to Fix It
|d Cham : Springer International Publishing AG,c2022
|z 9783030964733
|
| 797 |
2 |
|
|a ProQuest (Firm)
|
| 856 |
4 |
0 |
|u https://ebookcentral.proquest.com/lib/matrademy/detail.action?docID=6986485
|z Click to View
|