|
|
|
|
| LEADER |
01446nam a2200385 a 4500 |
| 001 |
EBC624742 |
| 003 |
MiAaPQ |
| 005 |
20200520144314.0 |
| 006 |
m o d | |
| 007 |
cr cn||||||||| |
| 008 |
100729s2011 enka s 001 0 eng d |
| 010 |
|
|
|z 2010029193
|
| 020 |
|
|
|z 9781444334937 (alk. paper)
|
| 020 |
|
|
|z 9781444329599
|
| 020 |
|
|
|z 9781444329612
|
| 020 |
|
|
|a 9781444329605 (electronic bk.)
|
| 035 |
|
|
|a (MiAaPQ)EBC624742
|
| 035 |
|
|
|a (Au-PeEL)EBL624742
|
| 035 |
|
|
|a (CaPaEBR)ebr10469733
|
| 035 |
|
|
|a (CaONFJC)MIL288426
|
| 035 |
|
|
|a (OCoLC)700701792
|
| 040 |
|
|
|a MiAaPQ
|c MiAaPQ
|d MiAaPQ
|
| 050 |
|
4 |
|a TH438.4
|b .G85 2011
|
| 082 |
0 |
4 |
|a 690.068/5
|2 22
|
| 245 |
0 |
0 |
|a Guide to good practice in the management of time in complex projects
|h [electronic resource] /
|c the Chartered Institute of Building.
|
| 260 |
|
|
|a Chichester, U.K. ;
|a Ames, Iowa :
|b Wiley-Blackwell,
|c 2011.
|
| 300 |
|
|
|a xxv, 143 p. :
|b ill. (chiefly col.)
|
| 500 |
|
|
|a Includes index.
|
| 533 |
|
|
|a Electronic reproduction. Ann Arbor, MI : ProQuest, 2015. Available via World Wide Web. Access may be limited to ProQuest affiliated libraries.
|
| 650 |
|
0 |
|a Building
|x Superintendence.
|
| 650 |
|
0 |
|a Production scheduling.
|
| 655 |
|
4 |
|a Electronic books.
|
| 710 |
2 |
|
|a Chartered Institute of Building (Great Britain)
|
| 710 |
2 |
|
|a ProQuest (Firm)
|
| 856 |
4 |
0 |
|u https://ebookcentral.proquest.com/lib/matrademy/detail.action?docID=624742
|z Click to View
|