|
|
|
|
| LEADER |
01726nam a2200445Ia 4500 |
| 001 |
EBC459590 |
| 003 |
MiAaPQ |
| 005 |
20200520144314.0 |
| 006 |
m o d | |
| 007 |
cr cn||||||||| |
| 008 |
060524s2006 dcu sb i000 0 eng d |
| 010 |
|
|
|z 2006047376
|
| 020 |
|
|
|z 0821366823
|
| 020 |
|
|
|z 0821366831
|
| 035 |
|
|
|a (MiAaPQ)EBC459590
|
| 035 |
|
|
|a (Au-PeEL)EBL459590
|
| 035 |
|
|
|a (CaPaEBR)ebr10132033
|
| 035 |
|
|
|a (CaONFJC)MIL51635
|
| 035 |
|
|
|a (OCoLC)70710014
|
| 040 |
|
|
|a MiAaPQ
|c MiAaPQ
|d MiAaPQ
|
| 050 |
|
4 |
|a HC1065.Z9
|b C36 2006
|
| 082 |
0 |
4 |
|a 333.91/409664
|2 22
|
| 100 |
1 |
|
|a Mazzei, Leonardo,
|d 1973-
|
| 245 |
1 |
4 |
|a The role of communication in large infrastructure
|h [electronic resource] :
|b the Bumbuna Hydroelectric Project in post-conflict Sierra Leone /
|c Leonardo Mazzei, Gianmarco Scuppa.
|
| 260 |
|
|
|a Washington, DC :
|b World Bank,
|c 2006.
|
| 300 |
|
|
|a xi, 42 p.
|
| 490 |
1 |
|
|a World Bank working paper,
|x 1726-5878 ;
|v no. 84
|
| 504 |
|
|
|a Includes bibliographical references.
|
| 533 |
|
|
|a Electronic reproduction. Ann Arbor, MI : ProQuest, 2015. Available via World Wide Web. Access may be limited to ProQuest affiliated libraries.
|
| 610 |
2 |
0 |
|a Bumbuna Hydroelectric Project.
|
| 650 |
|
0 |
|a Infrastructure (Economics)
|z Sierra Leone.
|
| 650 |
|
0 |
|a Communication in rural development
|z Sierra Leone.
|
| 650 |
|
0 |
|a Water-power
|z Sierra Leone.
|
| 650 |
|
0 |
|a Hydroelectric power plants
|z Sierra Leone.
|
| 655 |
|
4 |
|a Electronic books.
|
| 700 |
1 |
|
|a Scuppa, Gianmarco,
|d 1967-
|
| 710 |
2 |
|
|a World Bank.
|
| 710 |
2 |
|
|a ProQuest (Firm)
|
| 830 |
|
0 |
|a World Bank working paper ;
|v no. 84.
|
| 856 |
4 |
0 |
|u https://ebookcentral.proquest.com/lib/matrademy/detail.action?docID=459590
|z Click to View
|