|
|
|
|
LEADER |
06118nam a2200421 a 4500 |
001 |
EBC718841 |
003 |
MiAaPQ |
005 |
20200520144314.0 |
006 |
m o d | |
007 |
cr cn||||||||| |
008 |
110127s2011 dcuad sb i001 0 eng d |
010 |
|
|
|z 2011002973
|
020 |
|
|
|z 9780821384558
|
020 |
|
|
|a 9780821386521 (electronic bk.)
|
035 |
|
|
|a (MiAaPQ)EBC718841
|
035 |
|
|
|a (Au-PeEL)EBL718841
|
035 |
|
|
|a (CaPaEBR)ebr10468640
|
035 |
|
|
|a (CaONFJC)MIL310004
|
035 |
|
|
|a (OCoLC)729257487
|
040 |
|
|
|a MiAaPQ
|c MiAaPQ
|d MiAaPQ
|
043 |
|
|
|a fb-----
|
050 |
|
4 |
|a HD9688.S832
|b A37 2011
|
082 |
0 |
4 |
|a 333.793/20967
|2 22
|
245 |
0 |
0 |
|a Africa's power infrastructure
|h [electronic resource] :
|b investment, integration, efficiency /
|c Anton Eberhard ... [et al.].
|
260 |
|
|
|a Washington, D.C :
|b World Bank,
|c c2011.
|
300 |
|
|
|a xxix, 317 p. :
|b ill.
|
490 |
1 |
|
|a Directions in development (Washington, D.C.). Infrastructure
|
504 |
|
|
|a Includes bibliographical references and index.
|
505 |
0 |
|
|a Africa unplugged -- The region's underdeveloped energy resources -- The lag in installed generation capacity -- Stagnant and inequitable access to electricity services -- Unreliable electricity supply -- The prevalence of back-up generators -- Increasing use of leased emergency power -- A power crisis exacerbated by drought, conflict, and high oil prices -- High power costs that generally do not cover costs -- Deficient power infrastructure constrains social and economic development -- The promise of regional power trade -- Uneven distribution and poor economies of scale -- Despite power pools, low regional power trade -- The potential benefits of expanded regional power trading -- What regional patterns of trade would emerge? -- Water resources management and hydropower development -- Who gains most from power trade? -- How will less hydropower development influence trade flows? -- What are the environmental impacts of trading power? -- Technology choices and the clean development mechanism -- How might climate change affect power investment patterns? -- Meeting the challenges of regional integration of infrastructure -- Building a political consensus -- Strengthening regional institutions -- Setting priorities for regional infrastructure -- Facilitating project preparation and cross-border finance -- Developing regional regulatory frameworks -- Investment requirements -- Modeling investment needs -- Estimating supply needs -- Overall cost requirements -- The sapp -- Constant access rates under trade expansion -- Regional target for access rate : electricity access of 35 percent on average -- National targets for electricity access -- The EAPP/Nile Basin -- Constant access rates under trade expansion -- Regional target for access rate : electricity access of 35 percent on average -- National targets for electricity access -- WAPP -- Constant access rates under trade expansion -- Regional target rate : electricity access of 54 percent on average -- National targets for electricity access -- CAPP -- Constant access rates under trade expansion -- Regional target for access rate : electricity access of 44 percent on average -- National targets for electricity access -- Strengthening sector reform and planning -- Power sector reform in sub-Saharan Africa -- Private management contracts : winning the battle, losing the war -- Sector reform, sector performance -- The search for effective hybrid markets -- Regulatory institutions may need to be redesigned -- The challenges of independent regulation -- Regulation by contract -- Outsourcing regulatory functions -- Toward better regulatory systems -- A model to fit the context -- Widening connectivity and reducing inequality -- Low electricity connection rates -- Mixed progress, despite many agencies and funds -- Inequitable access to electricity -- Affordability of electricity : subsidizing the well off -- Policy challenges for accelerating service expansion -- Don't forget the demand side of the equation -- Take a hard-headed look at affordability -- Target subsidies to promote service expansion -- Systematic planning needed for periurban and rural electrification -- Recommitting to the reform of state-owned enterprises -- Hidden costs in underperforming state-owned enterprises -- Driving down operational inefficiencies and hidden costs -- Effect of better governance on performance of state-owned utilities -- Making state-owned enterprises more effective -- Defined roles and responsibilities -- Altering the political economy around the utility -- Practical tools for improving the performance of state-owned utilities -- Closing Africa's power funding gap -- Existing spending in the power sector -- How much more can be done within the existing resource envelope? -- Increasing cost recovery -- On budget spending : raising capital budget execution -- Improving utility performance -- Savings from efficiency-oriented reforms -- Annual funding gap -- How much additional finance can be raised? -- Little scope for raising more domestic finance -- Official development assistance : sustaining the scale-up -- Non-OECD financiers will growth continue? -- Private investors : over the hill -- Local capital markets : a possibility in the medium term -- Bank lending -- Equity -- Corporate bonds -- The most promising ways to increase funds -- What else can be done? -- Taking more time -- Lowering costs through regional integration -- The way forward.
|
533 |
|
|
|a Electronic reproduction. Ann Arbor, MI : ProQuest, 2015. Available via World Wide Web. Access may be limited to ProQuest affiliated libraries.
|
650 |
|
0 |
|a Rural electrification
|x Government policy
|z Africa, Sub-Saharan.
|
650 |
|
0 |
|a Energy policy
|x Social aspects
|z Africa, Sub-Saharan.
|
650 |
|
0 |
|a Capital investments
|z Africa, Sub-Saharan.
|
655 |
|
4 |
|a Electronic books.
|
700 |
1 |
|
|a Eberhard, Anton A.
|
710 |
2 |
|
|a ProQuest (Firm)
|
830 |
|
0 |
|a Directions in development (Washington, D.C.).
|p Infrastructure.
|
856 |
4 |
0 |
|u https://ebookcentral.proquest.com/lib/matrademy/detail.action?docID=718841
|z Click to View
|